Skip to content
-
Subscribe to our newsletter & never miss our best posts. Subscribe Now!
cgstatus logo cgstatus logo Cgstatus

Latest Blog

cgstatus logo cgstatus logo Cgstatus

Latest Blog

  • Home
  • Business
  • Cars
    • Used Cars
  • Finance
    • Insurance
  • Technology
  • Travel
  • News
  • Home
  • Business
  • Cars
    • Used Cars
  • Finance
    • Insurance
  • Technology
  • Travel
  • News
Close

Search

  • https://www.facebook.com/
  • https://twitter.com/
  • https://t.me/
  • https://www.instagram.com/
  • https://youtube.com/
Subscribe
cgstatus logo cgstatus logo Cgstatus

Latest Blog

cgstatus logo cgstatus logo Cgstatus

Latest Blog

  • Home
  • Business
  • Cars
    • Used Cars
  • Finance
    • Insurance
  • Technology
  • Travel
  • News
  • Home
  • Business
  • Cars
    • Used Cars
  • Finance
    • Insurance
  • Technology
  • Travel
  • News
Close

Search

  • https://www.facebook.com/
  • https://twitter.com/
  • https://t.me/
  • https://www.instagram.com/
  • https://youtube.com/
Subscribe
Home/Uncategorized/Barrow’s Forum and Market Hall rebuilds years away
Uncategorized

Barrow’s Forum and Market Hall rebuilds years away

By Shivani Rawat
August 15, 2026 3 Min Read

Doomed venue and market rebuilds years away

14 hours ago

Federica BedendoNorth East and Cumbria

Team Barrow An artist's impression of how a temporary events venue and market will look like in Barrow, where work to demolish and rebuild The Forum and market is under way. It includes containers, huts and stalls of different colours and a gazebo-type cover. It is a line drawing in pastel-coloured pencil showing no major detail. It looks like a temporary market in a town square.Team Barrow
“Team Barrow” said the Forum and Market Hall are expected to be rebuilt in 2035

A theatre venue and market hall facing imminent demolition will take nine years to be replaced with permanent structures, according to a new timeline issued by the group tasked with the redevelopment.

The Forum and Market Hall in Barrow, Cumbria, were shut in 2024 over issues with asbestos and subsequently doomed to be bulldozed.

Team Barrow, the name taken by the group working on regeneration plans for the town, has confirmed demolition is expected to start in 2028, with any rebuild unlikely to be completed before 2035.

In the meantime, it promised a “large event space” and a new market village to replace the temporary one currently in use.

Team Barrow said the event space would be “like those found at Edinburgh Fringe”, however the group has yet to explain what it means by that.

The festivals that run every August in the Scottish capital utilise existing theatres, lecture halls, event spaces, bars and temporary venues which dwarf anything that has ever been available in Barrow.

Theatre groups in the town have complained about a lack of detailed plans on a replacement for the 530-seater Forum, with Walney Musical Theatre Society’s chairman John Edwards calling the wait for news “sad” and “frustrating”.

Jennie Dennett The Forum in Barrow, a large modern building of red brick and some wood cladding at roof level, with a mainly glass entrance foyer and containing a market and theatre. Signs above its glass doors read 'arts and entertainment', 'theatre', 'cafe and bar', and 'market hall'. The building closed in 2024.Jennie Dennett
The building housing The Forum and Market Hall closed in 2024 and is going to be knocked down

Initial artist impressions released by Team Barrow show structures such as containers and canopies sitting alongside outdoor market stalls in the town.

The group said these would be rolled out from 2027, together with a refurbishment of public spaces around the town hall.

It would form part of the first phase of a regeneration led by Westmorland and Furness Council, with the initial work slated to cost £22.9m.

The Lib Dem council’s strategic director for communities Angela Jones said: “Transforming a town centre takes time and it will be delivered in phases over the next decade, beginning with this initial investment.”

Consultation events on a masterplan for Barrow will start in October, but dates and venues have yet to be confirmed.

Team Barrow said demolition of the Forum and Market Hall will not begin before those events take place.

In a statement, the group said enabling works were due to start towards the end of this year and, subject to planning, demolition would begin by early 2028.

Construction would then start by early 2029, Team Barrow said, with the full scheme complete by 2035.

Additional reporting by Simon Page, North East and Cumbria

Follow BBC Cumbria on X, Facebook, Nextdoor and Instagram and listen to Radio Cumbria on BBC Sounds.

More on this story

Frustration at ‘sad’ wait for new theatre plans

New theatre ‘ambition’ deemed not good enough

MP criticises council over town rebuild plans

Market and theatre have ‘reached end of life’

Related internet links

Team Barrow

Barrow-in-Furness
Cumbria
Westmorland and Furness Council
Theatre
Regeneration

Original source: https://www.bbc.com/

Author

Shivani Rawat

Shivani Rawat is a content writer with 7 years of experience creating helpful, reader-friendly articles for Geeksscan.com. She covers travel, business, technology, cars, and finance, focusing on simple explanations and practical tips. Shivani completed her graduation from Delhi University and now writes to make complex topics easy for everyone.

Follow Me
Other Articles
Previous

Derry Brownson: Founding member of EMF dies aged 55

Next

Eurovision Song Contest considers rule changes to discourage mass voting

No Comment! Be the first one.

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recent Posts

  • US Open 2026 results: Aryna Sabalenka continues title defence with one of the quickest Grand Slam wins of her career
  • Toxic haze from Indonesia spreads to Malaysia and Philippines as wildfires rage
  • Ancient evidence beneath Jesus’ traditional burial site matches details in scripture | Fox News Video
  • Site where Jesus was crucified and buried reveals new evidence that backs biblical account
  • Sheriff suing Maryland says sanctuary laws ignore lessons of 9/11: ‘Stupidity at its best’

Recent Comments

No comments to show.
Copyright 2026 — Cgstatus. All rights reserved.

Powered by
►
Necessary cookies enable essential site features like secure log-ins and consent preference adjustments. They do not store personal data.
None
►
Functional cookies support features like content sharing on social media, collecting feedback, and enabling third-party tools.
None
►
Analytical cookies track visitor interactions, providing insights on metrics like visitor count, bounce rate, and traffic sources.
None
►
Advertisement cookies deliver personalized ads based on your previous visits and analyze the effectiveness of ad campaigns.
None
►
Unclassified cookies are cookies that we are in the process of classifying, together with the providers of individual cookies.
None
Powered by